EditRegenerate Drawing
The Regenerate Drawing command enables you to regenerate only those views of the current drawing that are not updated with the referenced model, and skips those ones that are already in sync with the model.
The command is available only when the drawing has not yet been updated after changes have been made to the referenced model. To force the drawing to be regenerated, no matter whether the referenced model has been changed or not, use the Tools
Rebuild Drawing command.
Any changes you made to the parametric dimensions both in the model or in the drawing, or the reordering, redefining, removing, or reactivating of features in the model will be applied to the drawing.
If you inserted a Bill of Materials into your drawing, it will be updated as well.
If the rebuild action fails, a proper dialog box is displayed. See its description in Rebuild Model.
View regeneration options After editing any properties of a drawing view (View ![]() ![]() You can also choose if, after properties modifications, a view has to be automatically regenerated or not using the Regenerate: drop-down list, under the View area of the Drawing category under the System Options. |